April 23, 2026
Next generation battery system to Port of Geiranger
Exciting news from PSW! We’re delivering the 8.4 MWh battery‑integrated MCS in Geiranger — powered by the new CATL TENER Flex platform. A next-generation battery system designed not just for performance, but for real-world deployment challenges. So what makes TENER Flex stand out? TENER Flex gives us better degradation performance, modular installation, and high uptime […]
Read more
-
April 24, 2018
Makes Norwegian ports greener
PSW Group has via their subsidiary PSW Power & Automation recently secured several shore power projects, and is currently planning and projecting new facilities for CCB, North Agency, Ålesund Harbor and Kristiansund Harbor. The projects include both system delivery and electrical infrastructure at location. Ships that are docked must run their auxiliary engines to supply the ship with power; this causes harmful emissions such as […]
Read more